29. Post-earthquake bridge repair and the reopened Kyirong-Rasuwa trade route.

A Himalayan Border Trilogy: The Political Economies of Transport Infrastructure and Disaster Relief between China and Nepal

29. Post-earthquake bridge repair and the reopened Kyirong-Rasuwa trade route.